
Esperanza Elementary School – LA Unified School District
Greening Project
Los Angeles, CA
Project Overview
As 55,000 SF of green schoolyard is built, 30,000 SF of asphalt will be removed. In place of this asphalt will be 20,000 SF of California Native planting and 35 California Native shade trees. To keep these green spaces thriving, the project includes a high-efficiency irrigation system.
The students will also have expanded and improved areas to run, play, and learn. These amenities include a new running track, a 12,800 SF flexible lawn for multi-use play and stormwater infiltration swales, two outdoor classrooms with nature-based play structures, and 11,700 SF of solar reflective asphalt coating.
Project Details
Client
Los Angeles Neighborhood Land Trust
Budget
$3.5M
Delivery Method
Design/Bid/Build
Location
Los Angeles, CA
“I loved working with LCC3 Construction! They were organized and kept our project on time and under budget.”
– Katie K.